Upcoming Projects

As part of the street evaluation, the following streets will be repaired in 2024.

Street Status
Street Name Project Scope Status
N Corinth Street Temporary connection to I-35 Completed
Quail Run     Full Asphalt repair and crack sealing August start
State School Road Concrete repair 1212 State School To Hidden Oaks Drive  
Oakhollow Holding water between Vintage and Fair Oaks Circle Completed
2505 Glen Haven Panel replacement Completed
Windsor Parkway Full depth road repair between 3402 Windsor to Whitehall Drive  
Corinth Parkway Multiple locations Done
Robinson Multiple locations In Progress
Berkshire Lane 3119 panel replacement Completed
Westwind Drive 2 Panels Completed
Fieldwood Drive 4314 Curb Completed
Gold Rush Street 2806 2 Panels Completed
Merrimack Drive 4 Panels In Progress
Post Oak Trail 20 Panels Multiple locations  
Windridge Lane 4 Panels multiple locations Completed
Yellowstone Park Lane 2221/2201 2 Panels each Completed
Pecan Valley Panels and ADA Sidewalk issues Done
Mallory @ Landwick Multiple locations Done
Hidden Oak Circle Multiple locations Completed
Serendipity Hill Trail Multiple locations Completed
Old 77 Phase 1 Multiple locations Phase 1 completed